Insulation

The activity of the Insulation Unit has a special significance for MAESSAs productivity given its close ties with the Industrial Assembly Unit. Our company, which implements integrated projects, has been accredited with great prestige for the supply and assembly of naval and industrial acoustic insulation.

Main Projects
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
SITE1A
CUSTOMER: FOSTER WHEELER
SITE: EL BIERZO TECHNOLOGICAL DEVELOPMENT PLANT (CUBILLOS DEL SIL-LEON – SPAIN)
PROJECT: INSULATION OF PRODUCTION OF HEAT BOILER AND ASSOCIATED EQUIPMENT
YEAR: 2011
SITE1A   SITE1A
CUSTOMER: GE
SITE: BLENOD C.C.P.P (FRANCE)
PROJECT: ERECTION OF INSULATION OF POWER ISLAND
YEAR: 2010-2011
  CUSTOMER: SIEMENS
SITE: EMILE HUCHET C.C.P.P (SAINT AVOLD – FRANCE)
PROJECT: ERECTION OF INSULATION OF POWER ISLAND
YEAR: 2009-2010
SITE1A   SITE1A
CUSTOMER: RENOVABLES SAMCA
SITE:“LA FLORIDA” SOLAR THERMAL POWER PLANT (BADAJOZ – SPAIN)
PROJECT: SUPPLY AND ERECTION OF INSULATION OF PIPING AND SALTS TANKS
YEAR: 2010
  CUSTOMER: RENOVABLES SAMCA
SITE:“LA DEHESA” SOLAR THERMAL POWER PLANT (BADAJOZ – SPAIN)
PROJECT: SUPPLY AND ERECTION OF INSULATION OF PIPING AND SALTS TANKS
YEAR: 2010
SITE1A   SITE1A
CUSTOMER: ENDESA
SITE:C“AS PONTES” THERMAL POWER PLANT (A CORUÑA – SPAIN)
PROJECT: SUPPLY AND ERECTION OF INSULATION OF BURNERS – IV GROUP
YEAR: 2010
  CUSTOMER: ENDESA
SITE: SITE: “TERUEL” THERMAL POWER PLANT (ANDORRA -TERUEL - SPAIN)
PROJECT: ERECTION OF INSULATION OVERHAUL I-II-III GROUPS
YEAR: 2007-2009
SITE1A   SITE1A
CUSTOMER: ENDESA
SITE:“LAS SALINAS” DIESEL POWER PLANT (FUERTEVENTURA-SPAIN)
PROJECT:SSUPPLY AND ERECTION OF ACOUSTIC INSULATION OF GAS TURBINE 2
YEAR: 2010-2011
  CUSTOMER: ENDESA
SITE:“LOS GUINCHOS” DIESEL POWER PLANT (LA PALMA-SPAIN)
PROJECT: SUPPLY AND ERECTION OF ACOUSTIC INSULATION OF ENGINES ROOM 1
YEAR: 2010
SITE1A   SITE1A
CUSTOMER: GE
SITE: BLENOD C.C.P.P (FRANCE)
PROJECT: ERECTION OF ACOUSTIC INSULATION OF POWER ISLAND
YEAR: 2010-2011
  CUSTOMER: SIEMENS
SITE: EMILE HUCHET C.C.P.P (SAINT AVOLD – FRANCE)
PROJECT: ERECTION OF ACOUSTIC INSULATION OF POWER ISLAND
YEAR: 2009-2010
SITE1A   SITE1A
CUSTOMER: NAVANTIA
SITE: ALHD 1 & 2 SHIP FOR AUSTRALIAN NAVY IN FERROL SHIPYARD (A CORUÑA-SPAIN)
PROJECT:MERECTION OF STRUCTURAL INSULATION IN ENGINE ROOM AND CARGO AREA
YEAR: 2010-2013
  CUSTOMER: NAVANTIA
SITE: JUAN CARLOS I SHIP FOR SPANISH NAVY IN FERROL SHIPYARD (A CORUÑA-SPAIN)
PROJECT: ERECTION OF STRUCTURAL INSULATION IN ENGINE ROOM AND PIPING
YEAR: 2007-2010
SITE1A   SITE1A
CUSTOMER: H.J BARRERAS
SITE:“OSTENJO REDERIAS – NORWEGIAN COMPANY” IN BARRERAS SHIPYARD (VIGO – SPAIN)
PROJECT: SUPPY AND ERECTION OF STRUCTURAL INSULATION
YEAR: 2010
  CUSTOMER: H.J BARRERAS
SITE: 2 FERRY´S FOR “ARMAS SHIPPING LINE” IN BARRERAS SHIPYARD (VIGO – SPAIN)
PROJECT: SUPPY AND ERECTION OF STRUCTURAL INSULATION
YEAR: 2010-2012
SITE1A   SITE1A
CUSTOMER: NAVANTIA
SITE: SURVEILLANCE OCEAN PATROL VESSEL PROGRAMME (4 SHIPS) FOR VENEZUELAN NAVY IN PUERTO REAL SHIPYARD (CÁDIZ-SPAIN)
PROJECT: SUPPY AND ERECTION OF STRUCTURAL INSULATION
YEAR: 2008-2011
  CUSTOMER: NAVANTIA
SITE: 2 RO-ROS FOR ACCIONA TRANSMEDITERRANEA IN PUERTO REAL SHIPYARD (CÁDIZ-SPAIN)
PROJECT: SUPPY AND ERECTION OF STRUCTURAL INSULATION
YEAR: 2008-2010