The Renewable Energies Unit at MAESSA has had the opportunity to work with an array of strategic projects related to the development of renewable energies in Spain. Our company has had ample opportunities to create Turn Key Projects, from creation to execution. These projects include Photovoltaic, Solar Thermal, Wind, and Hydraulic plants.
![]() |
| CUSTOMER: RENOVABLES SAMCA SITE: LA DEHESA” SOLAR THERMAL POWER PLANT (BADAJOZ – SPAIN) PROJECT: ENGINEERING, SUPPLY, CONSTRUCTION AND START UP (TURNKEY PROJECT) YEAR: 2009-2011 |
![]() |
| CUSTOMER: RENOVABLES SAMCA SITE: “LA FLORIDA” SOLAR THERMAL POWER PLANT (BADAJOZ – SPAIN) PROJECT: ENGINEERING, SUPPLY, CONSTRUCTION AND START UP (TURNKEY PROJECT YEAR: 2009-2010 |
![]() |
![]() |
|
| CUSTOMER: GDF SITE: “CURBAINS” PHOTOVOLTAIC POWER PLANT (FRANCE) PROJECT: TURNKEY PROJECT, MAINTENANCE AND OPERATION (10 YEARS). 35 MW YEAR: 2009-2011 |
||
![]() |
| CUSTOMER: PAGOLA SITE: “ALMONACID DE LA SIERRA” PHOTOVOLTAIC POWER PLANT PROJECT: TURNKEY PROJECT OF A PHOTOVOLTAIC PLANT OF 5,6 MW NOMINAL POWER WITH DUAL AXIS TRACKING. MADE UP OF 225 FOLLOWERS OF 25 KW IN EACH GRILL PLATE, MONOCRYSTALLINE MODULES OF 175 W, INVERTERS OF 250 KW AND INTERCONNECTION NETWORK IS A MEDIUM VOLTAGE 15 KV YEAR: 2008-2009 |
![]() |
| CUSTOMER: GAMESA SOLAR SITE: “PINA DE EBRO” PHOTOVOLTAIC POWER PLANT PROJECT: INSTALLATION OF 300 KW NOMINAL POWER IN THE GROUND MIXED WITH FIXED PART AND FOLLOWERS OF 5,5 KW OF UNITARY INSTALLED POWER, BY MEANS OF MODULES OF 180 W YEAR: 2008-2009 |
![]() |
| CUSTOMER: L.SOL SITE: PHOTOVOLTAIC INSTALLATION “ALDEANUEVA (LA RIOJA)” PROJECT: INSTALLATION ON COVER OF 10.000 M2 WITH A NOMINAL POWER OF 400 KW REALIZED WITH POLYCRYSTALLINE MODULES OF 175 W YEAR: 2008-2009 |
![]() |
| CUSTOMER: SEVERAL SITE: PARTICIPATION IN 26 WIND FARMS WITH A JOINT POWER EXCEEDING 650 MW INSTALLED PROJECT: CIVIL WORK, MEDIUM VOLTAGE INSTALLATION, MECHANICAL ERECTION, ELECTRICAL INSTALLATION AND SUBSTATIONS YEAR: 2006-2011 |