MAESSAs Gas and Water Unit is global in the literal sense of the term. It covers from the construction of industrial gas pipelines to gas pipes in the home. This also includes everything in between such as distribution networks, regulation and measurement stations.
| GAS & OIL PIPELINES | ||
![]() |
![]() |
|
| CUSTOMER: ENDESA SITE: “AZAILA-ALBALATE DEL ARZOBISPO” GAS PIPELINE (ZARAGOZA-SPAIN) PROJECT: CONSTRUCTION OF PIPILINE OF 25 KM AND DN 10” WITH 3 POSITIONS AND ERM YEAR: 2010 |
CUSTOMER: ENDESA SITE: “ALBALATE DEL ARZOBISPO-ARIÑO” GAS PIPELINE (ZARAGOZA-SPAIN) PROJECT: CONSTRUCTION OF PIPILINE OF 25 KM AND DN 10” WITH 1 POSITIONS AND ERM YEAR: 2011 |
|
| GAS & OIL PIPELINES | ||
![]() |
![]() |
|
| CUSTOMER: GAS NATURAL SITE: “REDOVAN-LOS MONTESINOS” GAS PIPELINE PROJECT: BALLAST BLOCKS ON FLOODPLAIN YEAR: 2008-2009 |
CUSTOMER: GAS NATURAL SITE: “ORIHUELA-LOS MONTESINOS” GAS PIPELINE PROJECT: PIPE DISTRIBUTION YEAR: 2006 |
|
| GAS & OIL PIPELINES |
![]() |
| CUSTOMER: CLH SITE: “ROTA-ZARAGOZA”, GAS PIPELINE ADAMUZ VARIATION (CORDOBA-SPAIN) PROJECT: TRACE IN MOUNTAIN OROGRAFY YEAR: 2003-2004 |
| NETWORKS, VARIATIONS & INDUSTRIAL LINKS | ||
![]() |
![]() |
|
| CUSTOMER: GAS ARAGÓN, S.A. SITE: SUPPLY RAMAL TO I.P. MONREAL (TERUEL-SPAIN) PROJECT: DRAIN OPENING AND PIPE DISTRIBUTATION IN ROADWAY YEAR: 2007 |
CUSTOMER: GAS NATURAL, S.A. SITE: SUPPLY RAMAL TO RESIDENTIAL ZONE (BARCELONA-SPAIN) PROJECT: DRAIN OPENING AND PIPE DISTRIBUTION IN ROADWAY YEAR: 2005 |
|
| HORIZONTAL & CONDUCTED DRILLING | ||
![]() |
![]() |
|
| CUSTOMER: ENAGAS SITE: VARIATION TO MANOTERAS (MADRID-SPAIN) PROJECT: HORIZONTAL DRILLING VIAL TO PASS RADIAL 2 YEAR: 2003 |
CUSTOMER: DESARROLLO DEL CABLE, S.A. SITE: FCC TRES CANTOS (MADRID-SPAIN) PROJECT: CONDUCTED DRILLING FFCC TRES CANTOS YEAR: 2006 |
|
| HORIZONTAL & CONDUCTED DRILLING | ||
![]() |
![]() |
|
| CUSTOMER: ENDESA GAS TRANSPORTISTA SITE: CELLA-CALAMOCHA GAS PIPELINE (TERUEL-SPAIN) PROJECT: HORIZONTAL DRILLING ROAD TO SANTA EULALIA YEAR: 2006-2007 |
CUSTOMER: GAS NATURAL SDG, S.A. SITE: REDOVAN-LOS MONTESINOS GAS PIPELINE PROJECT: HORIZONTAL DRILLING FFCC YEAR: 2008-2009 |
|
| STATION CONTROL AND MEASUREMENT & VALVES POSITIONS | ||
![]() |
![]() |
|
| CUSTOMER: GAS NATURAL SDG, S.A. SITE: VALVES POSITION VALDEMINGOMEZ (MADRID-SPAIN) PROJECT: VALVES INSTALLATION AND POSITION PRE ERECTION YEAR: 2004 |
CUSTOMER: GAS NATURAL SDG, S.A. SITE: INDUSTRIAL ZONE LA NAVA, (PUERTOLLANO-SPAIN) PROJECT: PRE ERECTION BYPASS YEAR: 2006 |
|
| STATION CONTROL AND MEASUREMENT & VALVES POSITIONS |
![]() |
| CUSTOMER: ENDESA GAS TRANSPORTISTA SITE: CELLA-CALAMOCHA GAS PIPELINE (TERUEL-SPAIN) PROJECT: CALAMOCHA STATION CONTROL & MEASUREMENT YEAR: 2006-2007 |
| INDOOR INSTALLATION & CDI´S | ||
![]() |
![]() |
|
| CUSTOMER: GAS NATURAL SDG SITE: GASIFICATION TO CARAVACA DE LA CRUZ (MURCIA-SPAIN) PROJECT: CENTERING OF GAS METERS FOR RECEIVING COMMUNITY INSTALLATION YEAR: 2003-2011 |
CUSTOMER: GAS NATURAL SDG SITE: GASIFICATION TO OCAÑA (TOLEDO-SPAIN) PROJECT: INSTALLATION OF GAS METER FOR SUPPLY TO PARTICULAR YEAR: 2003-2011 |
|