MAESSAs trajectory in the field of industrial Assembly predates even its Constitution. MAESSA is the successor of AUXINI, a public company belonging to the now defunct National Institute of industry (INI). Thus, our experience dates back to 1972. From which date, we have experienced considerable international expansion, especially in Europe and Latin America. One of the essential divisions of MAESSA is the Industrial Assembly Unit and is notable for its record in energy-related projects: solar thermal power plants, nuclear power plants, petrochemical plants, etc. Also worth highlighting is our turnkey tank construction product line.
![]() |
| CUSTOMER: GENERAL ELECTRIC SITE: BLENOD C.C.P.P (FRANCE) PROJECT: MECHANICAL AND ELECTRIC ERECTION OF TURBOGROUP (1 x 435 MW) YEAR: 2010-2011 |
![]() |
| CUSTOMER: TÉCNICAS REUNIDAS SITE: MONTOIR DE BRETAGNE C.C.P.P (FRANCE) PROJECT: MECHANICAL ERECTION OF TURBOGROUP (1 x 435 MW) YEAR: 2009-2010 |
![]() |
![]() |
|
| CUSTOMER: SIEMENS SITE: EMILE HUCHET C.C.P.P (SAINT AVOLD - FRANCE) PROJECT: PIPING ERECTION OF MAIN AND AUXILIARY SYSTEMS - B.O.P. (2 x 430 MW) YEAR: 2009-2010 |
CUSTOMER: SIEMENS SITE: EMILE HUCHET C.C.P.P (SAINT AVOLD - FRANCE) PROJECT: MECHANICAL ERECTION OF POWER ISLAND (2 x 430 MW) YEAR: 2009-2010 |
![]() |
![]() |
|
| CUSTOMER: MAN SITE: DIESEL POWER PLANT (REUNION ISLAND - FRANCE) PROJECT: PREFABRICATION AND PIPING ERECTION, SUPPLY AND INSULATION ERECTION, STRUCTURE AND EQUIPMENTS ERECTION, DUCT (9 x 18 MW) YEAR: 2010-2011 |
CUSTOMER: ENDESA SITE: LOS GUINCHOS DIESEL PLANT (LA PALMA – SPAIN) PROJECT: MECHANICAL ERECTION WITH ASSOCIATED SUPPLY FOR DIESEL GROUP XII-XIII-XIV-XV (4 x 12,6 MW) YEAR: 2005-2006 |
![]() |
| CUSTOMER: EQUITATIS, S.A SITE: “SANTA ELENA” POWER PLANT (90MW) AND “QUEVEDO” POWER PLANT (100MW) (ECUADOR) PROJECT: ENGINEERING, SUPPLY, CONSTRUCTION OF 34 TANKS FOR STEEL STORAGE OF FLUIDS YEAR: 2010-2011 |
![]() |
![]() |
|
| CUSTOMER: FOSTER WHEELER SITE: EL BIERZO TECHNOLOGICAL DEVELOPMENT PLANT (CUBILLOS DEL SIL-LEON - SPAIN) PROJECT: MECHANICAL ERECTION OF BOILER AND AUXILIARY EQUIPMENT YEAR: 2010-2011 |
CUSTOMER: STANDARD BIOMASS SERVICE SITE: LINARES PLANT (JAÉN - SPAIN) PROJECT: ERECTION OF BIOMASS BOILER YEAR: 2008-2009 |
![]() |
| CUSTOMER: ECOLECTRIC SITE: COGENERATION THERMOELECTRIC PLANT (MILAGRO-EL GUAYAS-ECUADOR) PROJECT: CIVIL WORK, PREFABRICATION AND MECHANICAL ERECTION OF COGENERATION THERMOELECTRIC PLANT (27.5 MV) YEAR: 2006-2007 |