Naval Construction

Thanks to MAESSAs participation in important shipyard projects in Spain, we have become a leader in naval construction at a national level. We work on military projects for the Naval Fleets of Spain, Norway, Australia, Chile, Venezuela, and Malaysia, as well as civil projects; examples include Passenger Transport Ships, Oil Rigs, Dredges, and Freighters.

Main Projects
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
SITE1A   SITE1A
CUSTOMER: NAVANTIA
SITE: ALHD 1 & 2 SHIP FOR AUSTRALIAN NAVY
PROJECT: BLOCKS PREFABRICATION, OUTFITTING, PIPING AND INSULATION ERECTION AND SLIPWAY ASSEMBLY
YEAR: 2009-2012
  CUSTOMER: NAVANTIA
SITE: BPE FOR SPANISH NAVY
PROJECT: BLOCKS PREFABRICATION, OUTFITTING, PIPING AND INSULATION ERECTION AND SLIPWAY ASSEMBLY
YEAR: 2005-2008
SITE1A
CUSTOMER: NAVANTIA
SITE: “S-80” SUBMARINES PROGRAMME (4 SHIPS) FOR SPANISH NAVY
PROJECT: SECTIONS PREFABRICATION, OUTFITTING AND SECTIONS ASSEMBLY
YEAR: 2008-2017
SITE1A   SITE1A
CUSTOMER: NAVANTIA
SITE: MARITIME ACTION SHIP FOR SPANISH NAVY
PROJECT: BLOCKS PREFABRICATION
YEAR: 2009
  CUSTOMER: NAVANTIA
SITE: SURVEILLANCE OCEAN PATROL VESSEL PROGRAMME (4 SHIPS) FOR VENEZUELAN NAVY
PROJECT: BLOCKS PREFABRICATION
YEAR: 2007-2010
SITE1A
CUSTOMER: LA NAVAL
SITE: SUCTION DREDGER OF 46.000 M3 B-335 FOR JAN DE NUL SHIPOWNER
PROJECT: PREABRICATION AND SLIPWAY ASSEMBLY OF STERN PACKAGE BLOCKS
YEAR: 2009-2011
SITE1A
CUSTOMER: NAVANTIA
SITE: F-105 FRIGATE FOR SPANISH NAVY & F-310 FRIGATES PROGRAMME (5 SHIPS) FOR NORWEGIAN NAVY
PROJECT: BLOCKS PREFABRICATION, OUTFITTING, PIPING AND INSULATION ERECTION AND SLIPWAY ASSEMBLY
YEAR: 2006-2010
SITE1A   SITE1A
CUSTOMER: LA NAVAL
SITE: “CRISTÓBAL COLÓN” SUCTION DREDGER OF 46.000 M3 FOR JAN DE NUL SHIPOWNER
PROJECT: PREFABRICATION AND SLIPWAY ASSEMBLY OF STERN PACKAGE BLOCKS
YEAR: 2007-2009
  CUSTOMER: LA NAVAL
SITE: “SIMÓN STEVIN“ SUCTION DREDGER OF 33.500 DWT B-333 FOR JAN DE NUL SHIPOWNER
PROJECT: PREFABRICATION AND SLIPWAY ASSEMBLY OF BLOCKS OF 3 PACKAGES (CENTRAL DECK ZONE PORT - BOW AND STERN PACKAGE)
YEAR: 2008-2009
SITE1A   SITE1A
CUSTOMER: NAVANTIA
SITE: “ARTHUR N” ORE-CARRIER SHIP
PROJECT: REPLACEMENT OF 3 AUXILIARY ENGINES
YEAR: 2006
  CUSTOMER: NAVANTIA
SITE: “ALSTER N” ORE-CARRIER SHIP
PROJECT: REPLACEMENT OF 3 AUXILIARY ENGINES
YEAR: 2006
SITE1A   SITE1A
CUSTOMER: NAVANTIA
SITE: CONSTRUCCIÓN C-509 Y C-510 OF FERRY FOR ACCIONA TRANSMEDITERRANEA
PROJECT: BLOCKS PREFABRICATION
YEAR: 2007-2008
  CUSTOMER: NAVANTIA
SITE: “CANTABRIA” COMBAT SUPPLY SHIP FOR SPANISH NAVY
PROJECT: BLOCKS PREFABRICATION
YEAR: 2007-2008
SITE1A
CUSTOMER: NAVANTIA
SITE: “FAITH N” ORE-CARRIER SHIP
PROJECT: REPLACEMENT OF 3 AUXILIARY ENGINES
YEAR: 2006
SITE1A   SITE1A
CUSTOMER: NAVANTIA
SITE: “SCORPENE” SUBMARINES PROGRAMME (4 SHIPS) 2 FOR CHILEAN NAVY AND 2 FOR MALAYSIA NAVY
PROJECT: OUTFITTING, PIPING AND INSULATION ASSEMBLY
YEAR: 2002-2009
  CUSTOMER: NAVANTIA
SITE: “SELLA & TURIA” SHIP FOR SPANISH NAVY
PROJECT: OUTFITTING, PIPING AND INSULATION ASSEMBLY
YEAR: 2002-2004