Thanks to MAESSAs participation in important shipyard projects in Spain, we have become a leader in naval construction at a national level. We work on military projects for the Naval Fleets of Spain, Norway, Australia, Chile, Venezuela, and Malaysia, as well as civil projects; examples include Passenger Transport Ships, Oil Rigs, Dredges, and Freighters.
![]() |
![]() |
|
| CUSTOMER: NAVANTIA SITE: ALHD 1 & 2 SHIP FOR AUSTRALIAN NAVY PROJECT: BLOCKS PREFABRICATION, OUTFITTING, PIPING AND INSULATION ERECTION AND SLIPWAY ASSEMBLY YEAR: 2009-2012 |
CUSTOMER: NAVANTIA SITE: BPE FOR SPANISH NAVY PROJECT: BLOCKS PREFABRICATION, OUTFITTING, PIPING AND INSULATION ERECTION AND SLIPWAY ASSEMBLY YEAR: 2005-2008 |
![]() |
| CUSTOMER: NAVANTIA SITE: “S-80” SUBMARINES PROGRAMME (4 SHIPS) FOR SPANISH NAVY PROJECT: SECTIONS PREFABRICATION, OUTFITTING AND SECTIONS ASSEMBLY YEAR: 2008-2017 |
![]() |
![]() |
|
| CUSTOMER: NAVANTIA SITE: MARITIME ACTION SHIP FOR SPANISH NAVY PROJECT: BLOCKS PREFABRICATION YEAR: 2009 |
CUSTOMER: NAVANTIA SITE: SURVEILLANCE OCEAN PATROL VESSEL PROGRAMME (4 SHIPS) FOR VENEZUELAN NAVY PROJECT: BLOCKS PREFABRICATION YEAR: 2007-2010 |
![]() |
| CUSTOMER: LA NAVAL SITE: SUCTION DREDGER OF 46.000 M3 B-335 FOR JAN DE NUL SHIPOWNER PROJECT: PREABRICATION AND SLIPWAY ASSEMBLY OF STERN PACKAGE BLOCKS YEAR: 2009-2011 |
![]() |
| CUSTOMER: NAVANTIA SITE: F-105 FRIGATE FOR SPANISH NAVY & F-310 FRIGATES PROGRAMME (5 SHIPS) FOR NORWEGIAN NAVY PROJECT: BLOCKS PREFABRICATION, OUTFITTING, PIPING AND INSULATION ERECTION AND SLIPWAY ASSEMBLY YEAR: 2006-2010 |
![]() |
![]() |
|
| CUSTOMER: LA NAVAL SITE: “CRISTÓBAL COLÓN” SUCTION DREDGER OF 46.000 M3 FOR JAN DE NUL SHIPOWNER PROJECT: PREFABRICATION AND SLIPWAY ASSEMBLY OF STERN PACKAGE BLOCKS YEAR: 2007-2009 |
CUSTOMER: LA NAVAL SITE: “SIMÓN STEVIN“ SUCTION DREDGER OF 33.500 DWT B-333 FOR JAN DE NUL SHIPOWNER PROJECT: PREFABRICATION AND SLIPWAY ASSEMBLY OF BLOCKS OF 3 PACKAGES (CENTRAL DECK ZONE PORT - BOW AND STERN PACKAGE) YEAR: 2008-2009 |
![]() |
![]() |
|
| CUSTOMER: NAVANTIA SITE: “ARTHUR N” ORE-CARRIER SHIP PROJECT: REPLACEMENT OF 3 AUXILIARY ENGINES YEAR: 2006 |
CUSTOMER: NAVANTIA SITE: “ALSTER N” ORE-CARRIER SHIP PROJECT: REPLACEMENT OF 3 AUXILIARY ENGINES YEAR: 2006 |
![]() |
![]() |
|
| CUSTOMER: NAVANTIA SITE: CONSTRUCCIÓN C-509 Y C-510 OF FERRY FOR ACCIONA TRANSMEDITERRANEA PROJECT: BLOCKS PREFABRICATION YEAR: 2007-2008 |
CUSTOMER: NAVANTIA SITE: “CANTABRIA” COMBAT SUPPLY SHIP FOR SPANISH NAVY PROJECT: BLOCKS PREFABRICATION YEAR: 2007-2008 |
![]() |
| CUSTOMER: NAVANTIA SITE: “FAITH N” ORE-CARRIER SHIP PROJECT: REPLACEMENT OF 3 AUXILIARY ENGINES YEAR: 2006 |
![]() |
![]() |
|
| CUSTOMER: NAVANTIA SITE: “SCORPENE” SUBMARINES PROGRAMME (4 SHIPS) 2 FOR CHILEAN NAVY AND 2 FOR MALAYSIA NAVY PROJECT: OUTFITTING, PIPING AND INSULATION ASSEMBLY YEAR: 2002-2009 |
CUSTOMER: NAVANTIA SITE: “SELLA & TURIA” SHIP FOR SPANISH NAVY PROJECT: OUTFITTING, PIPING AND INSULATION ASSEMBLY YEAR: 2002-2004 |